Rizziconi's relationship with the local area

Relationship with the local area: the choice of location

Rizziconi demonstrated its commitment to the environment before the actual construction even began. The project was carried out only after completion of an in-depth territorial and social assessment, which examined the impact of the power plant on the site designated as it headquarters. This commitment is underlined on a daily basis through technological choices and continuous monitoring of the environmental impact.

The site: selection criteria and data analysis

The data analysis considered a variety of factors related to:

  • the environmental impact
  • the distribution of the inhabitants
  • the presence of other industrial developments
  • any architectural and landscape constraints

The most suitable area to accommodate power generation facilities was identified as the Plain of Gioia Tauro in Rizziconi.